
Reach our Columbia dispatch desk
Contact Us for Portable Toilet Rental in Columbia
Our dispatch desk takes quotes by phone weekdays for portable toilet or restroom trailer rentals. Call (803) 797-4918 for the fastest path; same-day response available. For non-urgent requests, use the online form.
Phone, Email, Office Hours
Call us at (803) 797-4918 for same-day quotes or next-day delivery. We keep our dispatcher’s calendar in sync with our email queue, so either way you reach the same person.
You can browse all portable toilet rental services on the home page before you dial. We offer Standard Porta Potty Rental, ADA-Compliant Portable Toilet units, and foot pump hand-washing stations with grey water containment. This helps our dispatcher manage your weekly servicing route efficiently.
- Phone
- (803) 797-4918
- Address
- 2200 Devine St
Columbia, SC 29205 - Office Hours
- Monday – Friday, 7:00 AM – 6:00 PM
Saturday, 8:00 AM – 2:00 PM
Sunday, dispatch on call - Service Area
- Columbia metro and surrounding Richland


Online Quote Form Response Time
Share your head count, timing, and budget in one form and we’ll have your quote ready in ten minutes.
We answer weekday calls inside one business hour. If we need the site layout, ADA stall count, or exact unit count, we’ll ask for those details to lock the delivery window. If your timeline is tight, we’ll move your order to the front of the queue at no extra cost. Call (803) 797-4918.
Most Columbia callers want to walk through **review portable toilet rental rates before booking**, so we cover flat hourly drive, weekly and monthly ranges, plus ADA or trailer upcharges and delivery surcharge before any deposit is taken.
When the schedule slips:
Emergency Dispatch After-Hours Support
After-hours calls go straight to a dispatcher who routes our fleet—flatbeds with lift gates and vacuum pumper trucks—into Columbia and Richland County within the hour. No menus, no delays, just the same calm operator voice you get at 2 p.m.
24/7 Phone Coverage
A live dispatcher answers after-hours calls on nights and weekends through the holidays with no menu tree.
Same-Day Service Calls
When a waste tank overflows or a tipped unit occurs, our vacuum truck dispatches within hours.
Storm & Event Surge
We stage units on weekend tipping runs and swap stock fast after storms or unexpected crowd surges when demand spikes.
Permitting Help
we’ll pull the last-minute special-event permit, ROW agreement, or county sanitation sign-off so the unit can land on schedule.
The understand the portable toilet rental process page walks through each step from the initial call through delivery at your Columbia site. It covers the pre-delivery walk-through, pump out schedule, and holding tank service interval before the truck arrives. After confirming your order, we handle the delivery handoff and weekly servicing on the schedule we agree to, with routine visits between pump out services.
Where We Deliver
We cover the Columbia metro and surrounding suburbs including Forest Acres, Irmo, Lexington, and Cayce. Same-day delivery runs within about a 25-mile radius from our shop at 2200 Devine St. Beyond that zone, we quote each run on request.
- Downtown Columbia
- Surrounding metro neighborhoods
- North Columbia corridor
- South Columbia corridor
- Richland unincorporated
- Outlying suburbs
- Event venues citywide
- Construction zones
Before You Call
+ What information should I have ready when I call?
Give us the count of units, the rental start and end dates, any ADA-compliant units required, the ground surface at the setup spot, and whether this is a jobsite or an event. We’ll quote the rate, lock the delivery window, and email confirmation all in the same call. Call (803) 797-4918.
+ How quickly can a unit get to my site?
For orders placed before noon, most units reach Columbia, Lexington, and Cayce the same day. Outlying areas like Batesburg-Leesville and Ridgeway receive next-day delivery. Restroom trailers need an extra day to set up on level ground.
+ Do you take credit cards over the phone?
We take credit cards and ACH over the phone, and established trade accounts can use net-30 terms. The dispatcher emails a written confirmation before delivery day. Call (803) 797-4918.
+ What if I need help understanding which unit fits my job?
When you call, the dispatcher walks through headcount, rental length, ADA access needs, and surface type—paved, gravel, or grass. Once we have the picture, we quote a weekly or monthly rate, lock the delivery window, and email a written confirmation before the truck rolls. Tight construction schedules get slotted first in the routing queue at no extra cost. We keep the vacuum pumper truck staged on 2200 Devine St with fresh water in the bladder and holding tanks emptied after each job. Call (803) 797-4918 to set up a drop.

Ready to Book Your Columbia Delivery
We can load fresh units tonight and have them staged by morning. Call now — the next delivery window opens within hours.